Infrastructure design, build & migration
Preparing for traffic spikes and revisiting architecture are considered together with operations after migration. We ask about current problems, the quality you need, and constraints you cannot change, then confirm whether and how design, build, and migration can be handled.
Work out load and business constraints
Design starts from more than average usage: the periods when load concentrates and the processes where latency is unacceptable. Acceptable downtime and how far data can be rolled back are also checked. We separate existing problems from expected growth, then consider headroom and redundancy.
Consider safety and ease of management
Network reach, administrator permissions, and how logs and backups are handled are considered together with how operations will run. Rather than choosing technology first, we confirm internal rules and what your team can manage. Individual build tasks are judged after discussion.
Decide the conditions for switching
In migration, listing dependencies, verifying behaviour, and agreeing rollback conditions matter most. We clarify where data updates stop and who approves the switch. Handover to operations needs contact points and daily checks as well as configuration information.